The Ecopetrol Group at a glance
March 3, 2025With the transformation of Colombia’s oil and gas sector a cornerstone of President Gustavo Petro’s agenda, the Ecopetrol Group is taking the lead. The Group experienced a dynamic 2024, with game-changing exploration success at the Sirius-2 well and the highest production levels seen in nine years. It is also betting strongly on sustainability and renewable energy projects.
UPSTREAM
Recent exploration milestones:
- 2024 investment in exploration: USD 330 million
- Wells drilled as part of 2024 exploration campaign: 10
- Seismic campaigns carried out: Cesar 3D, Yacopi 3D, COR 9 3D, Llanos 104 3D, Llanos 86 3D
- Exploration contract extensions in 2024: 15
- Around USD 1.3 billion to be allocated for exploration activities for 2024-2026
2024 production:
- Contribution of EOR: 307,000 boepd
- Contribution of Ecopetrol’s Permian Basin asset: 95,200 boepd
- Gas and LPG production of 173,000 boepd
- Investments in production: USD 2.262 billion
- Highest production levels in the last 9 years reached in 2024
—
MIDSTREAM & DOWNSTREAM
2024 highlights:
- Highest transported volumes in the last 5 years
- Cenit-Promigas agreement as an alternative to enable new gas supply in the country
- Volume transported by the Ecopetrol Group via pipeline: 1.126 million bopd
- Highest loading levels in the history of Colombian refineries
- Preparation and successful execution of industrial production test of 32,000 barrels of sustainable aviation fuel
- Ensuring the supply of fuels in Colombia by producing diesel and jet fuel, along with 64% of the petrol the country consumes, while the rest was imported
—
SUSTAINABILITY
- Goal of reaching 900 MW of renewable power by 2025, and 2.2 GW by 2030
- Total 253,000 tonnes reduction of CO2e GHG emissions in 2024
- Inauguration of the La Cira Infantas solar farm in Q4 2024 which guarantees 12,500 tonnes of CO2 emissions reduction per year
- Implementation of more than 100 digital solutions that drive energy efficiency and decarbonisation
- More than USD 78.7 million invested in Sustainable Territorial Development (including both social and environmental investments)
- New 5-MW hydrogen project planned at the Cartagena Refinery, which will produce 800 tonnes of green hydrogen yearly
Source: The Ecopetrol Group
Read our latest insights on:
-
-
-
O&M leadership in mining and energy
INTERVIEW
More content from Colombia


Quality seismic decisions for Angola
INTERVIEW

Colombia 













