Citing industry sources, Upstream Online said Chevron had issued pre-qualification documents for the deck and jacket of the project’s 14,000-tonne platform.
The contracts up for bidding will be for engineering, procurement and construction of the platform topsides, as well as for a 400-tonne bridge and thousands of tonnes of piles.
The contracts are expected to be awarded by the end of 2016.
The Captain field is located 145 kilometres northeast of Aberdeen, Scotland, at a water depth of about 106 metres. First production at the field began in 1997. Production in 2013 averaged 25,000 barrels of hydrocarbons liquids and 85,000 cubic metres (3 mcf) of gas per day. Chevron is the operator at the field with an 85-percent interest, while UK-headquartered Dana Petroleum holds a 15-percent stake.
Petronas has made a third oil and gas discovery in Suriname's offshore Block 52, the Malaysian company announced on Wednesday Read More
Japanese power generation player JERA on Thursday announced plans to invest USD 32 billion in LNG, renewables and new fuels… Read More
Chevron is planning to exit its North Sea operations after 55 years of activity in the oil hotspot, Reuters reported… Read More
Seatrium has been awarded a contract by SBM Offshore for the topsides fabrication and integration of an additional FPSO vessel… Read More
Diamond Offshore has secured a USD 350-million extension for an ultra-deepwater drillship deployed for Anadarko Petroleum in the US Gulf… Read More
ExxonMobil has made a discovery in the Angolan deepwater, the country's energy regulator announced on Monday Read More
This website uses cookies.