TotalEnergies, NNPC begin Ubeta gas project

TotalEnergies, NNPC begin Ubeta gas project

  • LinkedIn
  • Threads
  • Twitter
  • Facebook
  • Email

LAGOS, September 18, 2024 – The USD 550-million Ubeta gas project between TotalEnergies and the Nigerian National Petroleum Corporation (NNPC) has begun, Olu Verheijen, President Bola Tinubu’s special adviser on energy, disclosed on Tuesday.

Located within the OML 58 licence, the Ubeta gas and condensate field will be developed with a new cluster of six wells. Production is expected to start in 2027 and should reach a plateau of 8.5 mcm (300 mcf) per day, or about 70,000 boepd including condensates.

 

The OML 58 onshore licence is located 80 kilometres northwest of Port Harcourt and contains two fields currently in production, the Obagi oilfield and the Ibewa gas and condensate field.

Gas currently being produced in OML 58 is supplied to the Nigerian domestic gas market and to the Nigeria LNG (NLNG) liquefaction plant in Bonny Island, in which TotalEnergies holds a 15% interest. Gas from Ubeta will also be supplied to the facility, and processing capacity is currently being expanded from 22 million to 30 million tpy.

Verheijen stated that the project would deliver 350 mcf (9.9 mcm) of gas per day when operational.

TotalEnergies expects to reduce the carbon intensity of the OML 58 project through a 5-MW solar plant currently under construction at the Obite site and the electrification of the drilling rig.

Read our latest insights on: