The VAN-102 well is producing through the N’Goma FPSO following the startup of the second subsea multiphase boosting system, the company said.
“VAN-102 is a further step in the development of the Vandumbu field, launched on 29 November 2018, 3 months ahead of schedule, and which will be completed in Q1 2019 with the start-up of the water injection well. This, together with the startup of another production well in the Mpungi field, will bring the production of Block 15/06 to a total of about 170,000 barrels of oil equivalent a day (boed), further extending the production plateau,” Eni said in a statement.
The project is part of the West Hub development. Eni is the operator of Block 15/06 with a 36.84% stake, alongside <a href=’https://staging.theenergyyear.com/companies-institutions/sonangol/’>Sonangol P&P (36.84%) and SSI Fifteen (26.32%).
Oslo-listed Shelf Drilling has secured a contract for the Shelf Drilling Fortress jack-up rig with an undisclosed North Sea operator… Read More
A 720-MW Australian solar farm is pioneering a model of agrivoltaics with livestock integration by playing host to more than… Read More
Malaysia’s Sapura Energy has been awarded a five-year contract from Thailand’s PTTEP to conduct Pan Malaysia subsea services for Petronas… Read More
QatarEnergy has struck a USD 6-billion deal with the China State Shipbuilding Corporation (CSSC) to build 18 of the largest… Read More
Chevron has signed a deal with NAMCOR to develop an offshore block in the Walvis Basin, the Namibian NOC was… Read More
Ørsted’s Greater Changhua 1 and 2a offshore wind farms are in operation in Taiwan and their combined 900 MW of… Read More
This website uses cookies.